Yabot Jobs
MAV Project Services logo
Log in to apply

MAV Project Services

Construction Scheduler

Phoenix, AZ, US

Job at a glance

Workplace
On-site
Employment
Full-time
Sector
Operations & Manufacturing
Posted
Aug 13, 2025
First found
Nov 21, 2026, 10:05 AM ET

What's your fit?

Score your resume against this job to see your fit, the gaps and the risks.

About the job

·Responsibilities

  • The purpose of this position is to perform project controls administration including, but not limited to, the following: material expediting, quantity tracking, cost control, scheduling, document control, basic job cost management, subcontract management, and procurement
  • Functional Areas of Responsibility
  • Develop, update, and maintain project schedule
  • Support weekly schedule update meetings with project team
  • Support project team in issuing schedules, progress and commodity curves, basis of schedule, and histograms
  • Perform resource loading and levelling
  • Coordinate with the project team and/or subcontractors
  • Perform schedule and progress analysis and make recommendations to the project team
  • Assess impact of changes and deviations to the project schedule
  • Assist in developing “what if” exercises and mitigation strategies
  • Review the work hour forecast developed by the project team
  • Develop the baseline construction schedule outlining the sequence of work to be performed
  • Ensure that the schedule is updated per project requirements, based on change orders, field performance, availability of construction materials, and similar factors that can impact the final completion date
  • Submit schedule updates to customer as required by the contract documents
  • Ensure Weekly Progress, Manpower and Commodity Curves are developed, updated, and issued
  • Issue Weekly Schedule Analysis Report
  • Create detailed “Look Ahead” schedules and weekly updates as required
  • Ability to interface with the project team to gather information in the development and weekly updates of the project schedule
  • Effective working relationships with customer, subcontractors, and suppliers

Minimum Requirements

·      You have at least 8–12 years of site-based planning experience, with a strong background in industrial plant or large-scale construction projects

·      You also have the following Technical Skills: Advanced user of Primavera P6; strong knowledge of CPM scheduling, EVM principles, KPI tracking, and schedule deviation analysis

·      Visualization Tools: You have proficiency in creating graphics, charts, and visual dashboards; Power BI experience preferred

·      You are proficient in MS Office (especially Excel); and show familiarity with data visualization techniques and reporting best practices

·      Additionally, you have excellent written and verbal English, with strong reporting and presentation skills

·      You have the ability to interpret complex schedule and cost data to support decision-making

·      You show ability to work collaboratively with international teams across different time zones and manage effective communication channels

·      Further, you demonstrate flexibility: Willingness to adapt to site conditions, including overtime when needed

·      Preferred: you have experience in subcontractor performance verification, progress auditing, delivery tracking, and commissioning support

Benefits:

-PTO – 108 hrs/year to be accrued weekly; Can be used, rolled over, or paid out

-401(k) – 100% match up to 3% of contributions and 50% match of 4-5% contributions

-Health, Vision, Dental – BlueCrossBlue Shield options

-Per Diem if applicable

-Paid Trips Home if applicable